Wall blocks = blocks per course × number of field courses, where each course is one row stacked up the wall height. The waste allowance is already included.
Add 25 cap stones to finish the top course; they replace the top field row.
Order about 0.72 m³ of base leveling gravel and 3.3 m³ of clean drainage backfill behind the wall (compaction and void allowances included).
Next stepFor walls over about 1.2 m (4 ft), or any wall holding back a slope or surcharge, have an engineer confirm the design, reinforcement and drainage.