Volume adjusted for compaction and waste - order at least this much
Area1,200sq ft
Raw volume22.22cu yd
Weight (short tons)47.04short ton
Weight (metric tonnes)42.67t
Raw volume (cu yd)22.22
Order volume (cu yd)26.83
Weight (short tons)47.04
▸
Order at least 48 tons of Road base (compacted).
You need approximately 26.83 cubic yards (20.52 m3) of Road base (compacted) to complete this project.
That is about 47.04 US short tons. Most suppliers sell by the ton, so round up to the nearest full ton when placing your order.
A compaction allowance of 15% and a waste factor of 5% are already included in that figure.
Next stepOrder material in advance and confirm moisture content with your supplier - road base should be within 1-2% of optimum moisture content for best compaction.