Volume in cubic yards - the standard unit for ready-mix ordering
Volume528ft³
Cubic metres14.951m³
Bags needed880bags
Concrete weight79,200lb
Estimated cost0USD
ft³528
yd³19.56
m³14.951
▸
You need 19.56 yd³ of concrete (880 bags).
Your slab requires 19.56 cubic yards (528.0 ft³) of concrete including the waste allowance.
That is 880 premix bags at the selected bag size; always round up to avoid a short pour.
Over 3 cubic yards: ordering ready-mix concrete delivered by truck is usually faster and cheaper per yard than bagged mix.
Next stepConfirm slab thickness and sub-base preparation before ordering. For structural pours, ask your supplier about the correct concrete mix design (e.g. 3000 psi vs 4000 psi).