Limestone Calculator - Tons, Cubic Yards, Cost

Your details

The longest dimension of the area to be covered.
ft
The width of the area to be covered.
ft
Thickness of the limestone layer. Driveways typically need 4-6 in; patios 3-4 in.
in
Different grades have different densities. Choose the grade that matches your project.
Extra material to order for cuts, spills, and settling. 10% is standard; 15% for irregular shapes.
%
If buying bagged material, pick your bag size to see how many bags you need.
Leave at 0 to skip cost estimation. US average is $35-$75 per ton depending on grade and location.
USD
Flat delivery charge from your supplier, if any.
USD
Cubic yards
2.72cu yd

Volume with waste factor included - use this for ordering

Project area200sq ft
Volume73.33cu ft
Tons needed4.07tons
Pounds8,148lbs
Bags needed163
Cu yards2.72
Tons4.07

Order 2.72 yd³ (4.1 tons) of crushed limestone.

  • You need about 2.72 cubic yards (4.07 tons) of crushed limestone.
  • The order includes a 10% buffer for cuts and settling - always order at least 5-10% extra to avoid a second delivery.
  • At 2 inches instead of 4.0 inches, the same material would cover approximately 400 sq ft.
  • A 4 in depth is in the standard range for residential driveways and road bases.

Next stepGet at least two supplier quotes - limestone prices vary significantly by region and grade. Ask about delivery minimums, since many suppliers require 5-10 ton minimum orders for delivery.